Sunday, November 13, 2011

Tile and flooring

Almost done. Hold onto your shorts. The tile in the master bath and kitchen needs to get laid. The laminate flooring throughout the rest of the house needs to go down. The closet and pantry doors need to be installed. The half wall supporting the kitchen peninsula needs to get built and installed. The side deck landing pad and driveway stone needs to be placed. Hustle, hustle. I probably have some pics somewhere I should put online..

No comments:

Post a Comment