got out to the lot this morning with the intention of marking the block corners on the footing. however, everything was still a bit wet. so i decided to do a little digging while the ground is soft.
there were still a few sections of forms that i never got up. i dug out along the base of each piece and pried like crazy with the crow bar and various pieces of lumber until they were all up.
i then proceeded to backfill around the interior side of the perimeter footing and around the pier footings. it needs to be done sooner or later, and with them backfilled and sloped, rainwater won't pool around the footings. however, the exterior side of the perimeter footings remain exposed until the drain pipe is laid.
i was drenched in sweat and mud when i got home ;) time to relax.